1,
The house is not in size, it is to create a warm atmosphere, a unique personality of your life. For young families as well as single family, usually choose small Huxing as a transition. However, by the size and height of the impact, small Huxing in the design and decoration, or there are some principles to follow. Large-sized apartment not messy beautiful Now in the fashion world is more popular in the United States, it seems to be in a small apartment is not appropriate. Space is limited, and then create a number of highlights, it will make a small house is more stingy, the lack of overall sense. The correct approach is, in the first place, in the use of color, the best use of bright colors or plain, stress or too much jump colors will make a smaller space. In addition, the ceiling to do less, easy to do or not to do, only to do some simple Shi Huang line can be. If you want to use the local ceiling to distinguish between functional space, also do not “ ” “ ” echo. For the ground, all the dry areas are only used for one material. Large-sized apartment like “ soft ” doesn't love hard ” For joy & ldquo; soft & rdquo; don't love & ldquo; hard & rdquo; small Huxing, on the choice of furniture to compact and lightweight, otherwise they will put the room full of Serbs, feeling very depressed. While some can move, can change the furniture will be more suitable, either when the bed can also be when the sofa sofa bed, can be collected as part of the table & hellip; & hellip; < br / > In the decoration style, to the simple and modern, as far as possible to reduce the amount of decoration, but more to use accessories to decorate. “ “ ” ” will be warm and practical Warm home, comfortable home, small family members more intimate family members. However, space limitations to learn more adds, the effect will be better. The overall decoration should be simple, create an overall sense, but in the use of lighting, but should be spend bit of idea, using lighting to create the room effect, the formation of different visual space, for example, lamp, floor lamp, wall lamp, desk lamp, etc. can very good to create a different atmosphere. If very little cooking, then, the kitchen facilities can be simple, open style kitchen, the use of small bar to do breakfast area or reading area, also can be two people in the world one of the working table. It is worth noting that the small family also pay attention to the quality of life, especially the modern family for wiring with higher requirements, network cable, circuit to consider more detailed, warm home will be more practical and more scientific.
how to avoid the hotel decoration design rework of Beijing, Shanghai, Tianjin, Shenzhen and other first tier cities, there are people who have experience in the hotel to build experience, in the course of the renovation of the hotel, especially in the middle and later period, often there will be rework phenomenon, and the vast majority of electrical and mechanical. According to their own many years of experience in the hotel decoration summary of the general steps to build the hotel, the hotel will be built in accordance with this step will bring good. basically all the hotels have a time limit for the hotel operators, the shorter the time limit for the better, a shorter period of time can save the hotel rental costs, faster will be the hotel to open business, create profit and value. So in this big premise, the hotel to build a lot of engineering has become “ multilateral ” engineering, which leads to a lot of design work and construction work, etc. do not have enough time to coordinate, so as to rework buried hidden trouble. & nbsp; & nbsp; & nbsp; basic on a hotel project set, design consultant will moves plotting according to requirements of investors, waiting for choice after the construction party again later drawings, here basically are not what problem. But the next Electromechanical, refined decoration and curtain wall will often out of the problem, due to the lack of synchronization is often the structure of the construction is a long time, these three standards are not set down. In particular, the mechanical and electrical and refined decoration, and related to each other too much, deepening the process is not only required to coordinate with each other, but also requires the construction and other professional structure to follow. And finally lead to the design side, side bidding, construction and modification and in accordance with the views of fire protection, sanitation and epidemic prevention and environmental approvals and other also modified accordingly, plus on the middle of the project acceptance, resulting in a edge submittal, while acceptance, can be described as a multilateral, therefore in the early stage of design inspection must good decoration company, especially in first tier cities inside the decoration company, avoid let the affiliated company's small decoration company to do the project, especially Beijing decoration company, decoration company in Shanghai, Shenzhen decoration company first tier cities pay attention to study. how to avoid this kind of phenomenon in the process of building the hotel must have a high quality project manager. Because the hotel is in the construction period, because the investor pays great attention to the project progress, but because many investors do not understand the hotel, therefore it is difficult to carry on the comprehensive and detailed supervision to the hotel from the overall situation. Therefore, if investors want to ensure the high quality of the hotel to complete the construction work, we must have a high quality project manager for the hotel to build the whole process of supervision. & nbsp; & nbsp; & nbsp; time limit for a project is short, the disjointed, construction passing these are fundamental cause rework phenomenon, progress of the node set professional co-ordination caused by lack of, again with strain capacity and part of the system to the lack of professional knowledge and details of the index by poor, rework is inevitable. The hotel before the opening of several stages is quite important, relatively speaking, the late to raise, trial operation, business is relatively secondary. therefore, it is necessary to design and manage the hotel management company which is to build up the hotel management company in the course of hotel investment. Otherwise it will make the construction period of tense, rework phenomenon, resulting in a lot of time and money wasted.
hotel room standard design public corridor and room door: guest rooms are from the guest room door, must keep in mind that this, public corridors should focus on the lighting of the room door (purpose lighting). Door frame and the door wall of yang angle is easily damaged parts, the design need to consider the protection, steel door frame should be is a good idea, deformation, impact resistance. In addition, the door design should focus on performance, with real wood furniture and color design language interoperability, the width of the door leaf to 880-900mm appropriate. If unable to reach, so in the furniture design must to grasp the scale.& nbsp; & nbsp; & nbsp; indoor porch area: conventional room architectural design will form at the entrance to a 1.0-1.2 m wide small corridor, the door is on one side of the wardrobe into the wall. Expert advice: if you have the condition, as far as possible to arrange the wardrobe in the bed area, the guests will feel very convenient, but also to solve the long and narrow space inside the door to accommodate too many functions, causing inconvenience to use. Of course, entrance wardrobe can also do, especially in small space in the room. Some small investment budget rooms can even save a jumpsuit cupboard door. Only one use “ cavity ” can be directly put into the luggage. Business rooms upscale, can also increase in this area, ready to Taiwan hairdressing. Table 30cm depth. Guests can also put some of the system supplies, is a very thoughtful, considerate functional design. working area: a writing desk as the center. Furniture design to become the soul of this region. Strong and perfect business functions in this embodiment. Broadband, fax, telephone and one one sockets will be neatly arranged, messy wires should also receive clean. Writing desk location should be carefully considered, good lighting and sight is very important. Not necessarily as wall as in the past and sitting room.& nbsp; & nbsp; & nbsp; entertainment and leisure area, receive a visitor area: previous business standard rooms in the design drawing function is gradually weakening. From the point of view of the housing guest, he hopes the guest room is private, totally free. In the future visitors to the room in a variety of inconvenience. From the hotel operator point of view, in the guest room in the hotel reception of course as to the place of business reception. The production efficiency, What is there against it?? This transformation is a more comfortable and enjoyable function of the guest room, and a space condition for advancing. Design can be read, enjoy music, and many other functions to increase in, change in the room can only lie on the bed watching TV in a single situation. bed area: This is the largest area of the functional area of the whole room. Bedside screen and bedside table becomes a key problem in design. In order to meet the needs of different guests, convenient hotel sales, between the two beds does not set the bedside table or a simple table device is arranged, when needed can be folded up. As to focus on the control panel not to mention, this is the most out of the room in the device. Table to be set up on both sides of the bed, because it functions very simple, easy to use the most important, must not be too complex. Bedside back screen and wall is relatively complete room in the room, you can focus on characterization. But to pay attention to bed above a horizontal plane 70cm around the area, head location of the guests easy dirty, need to consider the antifouling materials, adjustable light a lamp or lamps (wall as well), shaping the light environment of bed area is very important, can not be ignored. bathroom: bathroom space is independent, wind, water, electricity system is staggered complex. Equipment, the area is small, should follow the principle of human engineering, human nature design. In this regard, the dry and wet area of separation, toilet area separation is an international trend, to avoid mutual interference, cross function.& nbsp; & nbsp; & nbsp; 1. The basin area: mesa and makeup mirror is the focus of bathroom design, it is necessary to pay attention to the above the basin with the quartz lamp lighting and specular unilateral or bilateral wall lamp lighting, the two best are not missing.& nbsp; & nbsp; & nbsp; 2. Then District: first ventilation, lighting is good, an often neglected issue is phone and toilet paper rack position, are often installed here toilet back wall and inconvenient to use. In addition, the design of the small bookcase with the ash tray also shows the hotel's careful and thoughtful.& nbsp; & nbsp; & nbsp; 3. The bath area bathtub whether to retain the owners often become & ldquo; chicken & rdquo; problem and most of the guests reluctant to use the bath, the bath itself has also brought increasing load, and increasing investment, to extend the time for housing many unfavorable factors, unless it is the grade of the wine shop level and room is equipped with a bath, otherwise can fine shower instead, save space and reduce investment. Also regardless of whether the use of a bathtub, shower area of the wall material in the choice to avoid not easy to clean materials, like frosted or sub quality should be used with caution. 4 other equipment: high humidity and high temperature, good ventilation equipment is very important. Can choose to exhaust air mask and the body of the separation and installation of the way (panel on the ceiling, the fuselage on the wall), can greatly reduce the operating noise, also extended the use of life, the wall is easy to install the use of dry hair, resonance occurs, it is also necessary to pay attention to! About control room in the circuit control, generally refers to the lights of the circuit and switch control. Obviously, the old centralized control panel is not easy to use, it is not appropriate to continue to use. “ family ” the requirements of the hotel will be the control mode, and back to the home mode --- in the vicinity of the corresponding lighting lamps have a corresponding switch panel control, concise and clear, consistent with the use of the guests.
The construction process of storefront renovation The 1 approach, wall, wall. 2 cut line groove, water and electricity transformation and acceptance. 3 hydropower renovation project hidden buried slot. 4 carpentry approach, hanging ceiling, gypsum corner. 5 package door, window cover, making wooden cabinet frame. 6 synchronous production of all kinds of wooden doors, plastic doors and flat pressure. 7 wooden panel brush dustproof paint (oil). 8 window laying marble table leveling. 9 wood trim panel paste, line production and fine installation. 10 metope processing, grinding, leveling. 11 furniture, door seam adhesive (protection). 12 wall oil ICI at least three times. 13 furniture paint approach, eye patch, paint. The 14 corner, laying tiles, wood or composite wood floors, marble waterproof, skirting board. 15 lamps, sanitary ware, handle, door lock installation and commissioning. 16 cleaning, floor tile repair, remove the field. 17 interior decoration company preliminary inspection. Three 18 party booking time, delivery of the owners.